Elm Springs Road Interchange - Springdale, AR

Crafton Tull provided engineering design services on the Elm Springs Road Interchange. The design required widening to six lanes, ramp widening, and signal upgrades around the I-49 interchange. The project included earthwork, ACHM Base, Binder and Surface Courses, storm drainage system items, traffic signal items, maintenance of traffic items, widening a continuous composite w-beam bridge, erosion control, and miscellaneous items.