U.S. 67 Relocation - Hoxie, Arkansas

Crafton Tull provided plans for right-of-way, grading and structure, and base and surfacing for the U.S. 67 relocation in Hoxie, Arkansas. The project consisted of a 17 mile stretch of highway including one interchange, a set of main lane bridges, four overpasses, and four major drainage structures. Bridge types consisted of steel plate girder and wide-flange steel beam superstructures with cast-in-place decks supported on reinforced concrete bents with concrete-filled steel shell piling foundations. The bridge sites are within a Class B seismic zone. Our team prepared all plans in metric units.