Interstate 40 Rehabilitation - Pope, Faulkner, Johnson, and Conway Counties, AR

Crafton Tull provided extensive traffic plans for the 54 mile I-40 rehabilitation project to ensure the safe and efficient flow of traffic on the busy road. It was imperative to the flow of bond funding that the Arkansas Department of Transportation (ARDOT) meet its construction schedule. The existing concrete pavement was rubblized and overlaid with asphalt, and all the roadside safety features were replaced. Several pairs of main bridge structures were replaced, and three bridges were jacked to provide minimum vertical clearances over existing roadways.