Promenade Boulevard and Bellview Road - Rogers, AR

Developers of the Pinnacle Promenade and the Mercy Medical Center hired Crafton Tull to provide surveying, design, and construction management for the new arterial and collector streets involved in Promenade Boulevard, a perimeter street connecting a busy shopping area and hospital to a new interchange off I-49. The design included dual left and right turn lanes for the major streets and commercial entrances with decorative traffic signals and street lights. Also incorporated into the design a five-foot-wide sidewalk along each side of the boulevard and a storm sewer system designed to accommodate the runoff from a 10-year storm event. The projects also required the installation and coordination of numerous utility franchise companies.