PROJECTS
||
|
Surveying
All Projects
Commercial
Community
Education
Health
Industrial
Parks
Planning
Residential
Streets
Surveying
Trails
Transportation
Water / Wastewater
Water Resources
All Projects
Commercial
Community
Education
Health
Industrial
Parks
Planning
Residential
Streets
Surveying
Trails
Transportation
Water / Wastewater
Water Resources
Highway 82B Improvements Survey
This project is located along approximately 3.39 miles of existing Highway 82B and included staking temporary markers 1068± denoting the proposed right-of-way and easements to support the right-of-way (198± tracts) and easement (167± tracts) acquisition, a pre-construction task referenced to the original 2013 Parcel Surveys, located in downtown El Dorado. The survey was performed in accordance with the Arkansas Department of Transportation’s Requirements and Procedures for Control, Design, and Land Surveys located at https://www.ardot.gov/divisions/surveys/manuals/.
ARDOT Task Order No. M154, FAP No. 9990
The scope included the following task(s):
- ROW MONUMENTING
- ROW STAKING FOR APPRAISALS
- ROW STAKING FOR UTILITIES