PROJECTS
Rogers Infrastructure Study
This study assisted the City of Rogers with planning its next bond issue program and updating the city’s Master Street and Trail Plan. The study included a thorough review of previous planning documents, interviews with city departments and other organizations, tabulation of an unconstrained list of potential city infrastructure projects, ranking and prioritization for the next bond issue, and planning the logical and smooth sequence of infrastructure program development over a six-year period.
The study included management of a traffic engineering subconsultant to analyze existing and projected traffic volumes and patterns. Also included was an update to the city’s Master Street and Trail Plan with an emphasis on reinstituting a city street grid and connecting isolated neighborhoods to increase the efficiency of traffic flow in the city.